Track Record

BESS Project Portfolio

Over 50 successful BESS deployments across Vietnam and Southeast Asia.

C&I / Peak Shaving2024

BESS 5 MWh — Binh Duong Industrial Park

Capacity:5 MWh / 2.5 MW
Status:Operational
Result:~$35,000/yr savings
Utility / Solar+Storage2024

Utility BESS 20 MWh — Ninh Thuan

Capacity:20 MWh / 10 MW
Status:Operational
Result:FCR + Arbitrage
Microgrid / Island2023

Microgrid 2 MWh — Con Dao Island

Capacity:2 MWh / 1 MW
Status:Operational
Result:70% diesel cut
C&I / UPS + Peak2023

BESS 1 MWh — Hanoi General Hospital

Capacity:1 MWh / 500 kW
Status:Operational
Result:Zero downtime
Utility / Wind+Storage2022

Containerized BESS 10 MWh — Ha Tinh

Capacity:10 MWh / 5 MW
Status:Operational
Result:Freq. regulation
C&I / Peak Shaving2022

C&I BESS 500 kWh — Food Processing Plant

Capacity:500 kWh / 250 kW
Status:Operational
Result:~$13,000/yr savings
500+
MWh Deployed
50+
Projects Completed
15+
Provinces in Vietnam
0
Critical Safety Incidents

Become Our Next Success Story

Contact our engineering team for free consulting and an economic simulation report for your facility.

Contact Our Engineers →